Holborn Bars, London

Strip out

Background

Lancebox ltd carried out the M&E / plant room removal at Holborn Bars for Hatmet.

Scope of works

  • Complete removal of decommissioned back up generator systems comprising of:
  • 3x sets of 16-cylinder 27 litre Detroit 2 stroke engines
  • Stamford 12,000 KVA including full exhaust systems
  • Cooling SVS transformers
  • Switchgear and fuel tanks including mezzanine steel structure
  • 6-ton crawler crane was used to remove engines to then be recycled

“Lancebox have been a pleasure to work with from Start to Finish. They were always positive & proactive, which if they had not had this attitude, the Project could have failed. I have worked with some of the largest Demo Contractors in London over the past 38yrs and I can say that Lancebox now Top my List of Contractors and I look forward to working safely again with them in the future. Thank you all for your hard work, co-operation & diligence and I look forward to working with the Team again.”