Strip out
Background
Lancebox Ltd carried out the strip out and temporary works at Kingston University for Engie.
Scope of works
- Strip out of 600 dorm rooms back to a shell
- Forming openings and temporary works
- Steel goal post system
- Building was occupied and therefore works had to be completed in a sensitive manner